CNBC
Boeing CEO: 737 Max production taking 'a little bit longer' to stabilize than expected
Wednesday, September 16, 2026
Boeing's chief executive officer stated that stabilizing 737 Max production is proceeding more slowly than previously anticipated. The 737 Max was grounded from March 2019 to November 2020 following two fatal crashes, and Boeing has faced ongoing production challenges since returning the aircraft to service.
Original reporting: https://www.cnbc.com/2026/09/16/boeing-ceo-737-max-production.html
